gogo

ARM 4 : Agreed rules of measurement 2009 / [Prepared by a joint committee established by the Construction Industry Federation and the Society of Chartered Surveyors : Chairman Michael Mulryan.

By: Contributor(s): Material type: TextTextPublication details: Dublin : Society of Chartered Surveyors, 2010.Description: 163 p. : tabs. ; 30 cm. pbk. (Spiral binding)Other title:
  • Agreed Rules of Measurement 4 2009
  • Arm 4 2009
Subject(s): DDC classification:
  • 692.3
Contents:
General rules -- Preliminaries -- Demolition and alterations -- Excavation and earthwork -- Piling -- Concrete work -- Brickwork and blockwork -- Stonework -- Roofing, cladding and waterproof -- Woodwork -- Steelwork -- Metalwork -- Mechanical installations -- Electrical installations -- Floor wall and ceiling finishings -- Glazing -- Painting and decorating -- Drainage -- Surface pavings, fencing and landscaping -- Fittings, equipment and furniture.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
General Lending Carlow Campus Library General Lending 692.3 (Browse shelf(Opens below)) 0 Available 62141
Reference Carlow Campus Library Reference 692.3 (Browse shelf(Opens below)) 0 Not for loan 62142
General Lending Carlow Campus Library General Lending 692.3 (Browse shelf(Opens below)) 1 Available 61623
Reference Carlow Campus Library Reference 692.3 (Browse shelf(Opens below)) 1 Not for loan 85277

Queries may be directed to Anna Hogan at Society of Chartered Surveyors.

General rules -- Preliminaries -- Demolition and alterations -- Excavation and earthwork -- Piling -- Concrete work -- Brickwork and blockwork -- Stonework -- Roofing, cladding and waterproof -- Woodwork -- Steelwork -- Metalwork -- Mechanical installations -- Electrical installations -- Floor wall and ceiling finishings -- Glazing -- Painting and decorating -- Drainage -- Surface pavings, fencing and landscaping -- Fittings, equipment and furniture.

46.50

Powered by Koha